Aevitas in BC completes unique and complicated environmental projects within budget, and on-time. Our company's waste management services have helped companies in British Columbia, Alberta, Ontario and Quebec for more than 24 years. Here are a few of the recent projects that our highly trained waste management specialists have been involved in:


Transformer Removal and Replacement

Transformer Removal and Replacement

Our company supplied the equipment and personnel to drain, remove and treat 125,942 litres of used transformer oil. Note in the picture the temporary secondary containment set-up by us to capture any spills and contain hazardous material in the event of a release. After installation we provided vacuum filling on seven 50MVA single phase CG Power Systems transformers.

Waterside Projects

Aevitas Inc. has been instrumental in developing and implementing many waterside on-site transformer services throughout Ontario. These projects involve draining, removing and treating used transformer oil, vacuum filling transformers with new oil, degasifying and topping up transformer oil, and transporting and recycling obsolete transformers, and providing replacement units. To learn more about our many waterside projects, please visit.

Waterside Projects
Mercury Arch Valve Decommissioning Project

Mercury Arch Valve Decommissioning Project

We engineered and fabricated custom hazardous waste containers to safely transport 37 mercury arch valve components being decommissioned for hazardous waste disposal. Having the only commercial mercury retort oven in Canada, our company was able to effectively recover the mercury contamination from the parts and recycle the metals. As such, we recycled over 400,000 kilograms of decontaminated metal and recovered 1,800 kilograms of elemental mercury.

Transportation and Disposal of PCB Bushings

Our company delivered custom hazardous waste containers to safely transport PCB electrical bushings for disposal at our Kirkland Lake, Ontario hazardous waste management facility. These bushings measured over 38 feet in length and were completely contained in the pictured 40-foot-long unique shipping container. Our client was so pleased with our ability to exceed their expectations that they have since hired us to perform many other similar services for their company.

Transport and Disposal of PCB Bushings
Transformer Removal and Replacement

Transformer Removal and Replacement

Our organization has also provided hazardous waste removal equipment and personnel to drain and dispose of 93,000 litres of used transformer oil. Three obsolete transformers were transported and recycled at our Kirkland Lake, Ontario facility. Our on-site services vacuum filled 25,000 litres of transformer oil into the replacement units. In the photo, notice the water rushing from the hydroelectric dam in front of the truck, and the temporary secondary containment around the work area in the bottom right.

Transformer Oil Change:  Oil Craned In and Out

Aevitas Inc. provided hazardous waste disposal equipment and personnel to drain and remove 25,000 litres of used transformer oil. This job was unique in that the oil had to be craned in totes across the dam and water. In the image, note the secondary containment set-up around the tanker truck to prevent a hazardous waste release into the environment.